Tidewater Residences
A single 34-storey tower, structure complete, finishing under way.
Street elevation · 1 / 5
- Starting price
- ₹1.85 Cr
- Possession
- Dec 2026
- Status
- Under construction
- Units
- 228
- Land
- 1.8 acres
Overview
About Tidewater Residences
A society redevelopment with all 118 member consents registered before work began. The structure topped out in March; interiors and facade are in progress and tracked against the RERA date.
Legal verification
All five checks passed.
Last reviewed 6 May 2026 by partner counsel · RERA no. PLJ-DEMO-MH-26-0654
- Verified
Title chain
30-year ownership chain traced with no breaks or competing claims.
- Verified
RERA registration
Registration active; quarterly filings are up to date.
- Verified
Plan sanction & land use
Sanctioned plans match what is being built and sold.
- Verified
Encumbrance & litigation
No undisclosed mortgage, lien or pending suit on the land.
- Verified
Escrow account
70% of buyer payments are ring-fenced for construction.
Price & specifications
Configurations
| Configuration | Carpet area | Starting price | Per sq ft |
|---|---|---|---|
| 2 BHK | 740 sq ft | ₹1.85 Cr | ₹25,000 |
| 3 BHK | 1,090 sq ft | ₹2.82 Cr | ₹25,872 |
| 4 BHK | 1,760 sq ft | ₹4.6 Cr | ₹26,136 |
Prices exclude stamp duty, registration and GST. Final price depends on floor and facing.
Floor plans
Schematic layouts
2 BHK
740 sq ft
3 BHK
1,090 sq ft
4 BHK
1,760 sq ft
Schematics are indicative. Sanctioned drawings are shared with the verification report.
Amenities
What is included
- Sky lounge on level 34
- Temperature-controlled pool
- Double-height lobby
- Gymnasium
- Mechanical car parking
- Fire refuge floors
- Society office
- Rooftop solar
Location
Chembur, Mumbai
- Eastern Freeway
- 1.9 km
- Chembur monorail station
- 650 m
- Bandra Kurla Complex
- 7.5 km
- Diamond Garden
- 1.0 km
The builder
About Tidewater Homes
Tidewater HomesRedevelopment specialists in Mumbai's eastern suburbs, with society consents and tenant agreements documented up front.
- Founded
- 1994
- Projects delivered
- 39
- Delivered on time
- 91%